KNX Cable Selection, Routing, and Length Rules
Check KNX TP cable requirements, the 350 m, 700 m and 1,000 m distance rules, route drawings, segregation, and end-of-installation evidence.

A riser drawing can show a 250 m run while the cable schedule puts the line close to 1,000 m. Both can be right. The first number describes a route across the building. The second includes every installed branch on that TP line.
For a conventional KNX TP installation using specified bus cable and a suitable external bus supply, there are three separate checks: 350 m from supply to device, 700 m between devices, and 1,000 m total installed bus cable. Follow any tighter product limits and the approved topology. ABB illustrates all three checks on the same branched layout. ABB training note on KNX TP cabling, slides 22–24
Put an exact cable on the schedule
Specify a registered or certified KNX TP cable variant suitable for the route. Match the product number and declared electrical characteristics, including loop resistance and capacitance. Confirm conductor compatibility with the device terminals, and verify the applicable building requirements for reaction to fire, installation environment, and separation from power circuits. A green jacket or a conductor diameter alone cannot establish equivalence. KNX Association cable resources
| Route detail | Ask for on the drawing or schedule | Why it matters |
|---|---|---|
| Orderable cable | Manufacturer, product number, declaration and intended use | Prevents substitutions based on color or jacket label |
| Indoor to exterior transition | Entry point, environment, protection review and approved cable | Outdoor exposure and building entry can change the design |
| Mixed-voltage enclosure | Approved segregation and termination detail | A cable tray rule may differ from the rules at stripped conductors and terminals |
| Branch or transition | Reference tag, access location and cable IDs | Future service needs a point that can be located |
| Spare conductors or cable tails | Documented intended use and assigned line | Prevents an unused pair or tail from being mistaken for an approved bus circuit |
Use the project wiring rules and equipment instructions for segregation and insulation, especially inside cabinets and wall boxes. Have the electrical installer check the entry, restraint, and termination arrangements against the approved detail before the cover closes. ABB and Busch-Jaeger bus cabling note
Measure a route with three numbers
Consider an illustrative line fed at a junction with four separate branches. Route lengths from the junction, including fitted tails, are 315 m, 260 m, 210 m and 170 m. Assume each has an end device and there are no other connected sections.
| Check | Calculation from the branch schedule | Design result |
|---|---|---|
| Supply to farthest device | Maximum of 315, 260, 210 and 170 m | 315 m against 350 m |
| Farthest device to device | 315 + 260 m through the shared junction | 575 m against 700 m |
| Total installed line length | 315 + 260 + 210 + 170 m | 955 m against 1,000 m |
Now add a 60 m extension to the 170 m branch. The longest supply path stays at 315 m. The longest device path stays at 575 m. The total rises to 1,015 m. The branch to the new device looks short, and the line still fails the total-length check.
On a real tree, measure between devices along connected cable. Add physical sections once when computing the total, even when several paths share the same section. Keep loops out of the TP wiring plan and record branching points. The source example assumes the supply is at the junction. A riser relocation can change the supply-to-device maximum even if the total cable is unchanged.
A second supply does not grant an automatic extra cable allowance. Check the exact compatibility, spacing, loading and permitted arrangement before specifying parallel supplies. Siemens documents its own equipment conditions, including different limitations for internally supplied PL-Link networks. Read the table applicable to the equipment and bus design. Siemens KNX installation details
Keep the route that was actually installed
The cable schedule should carry a segment ID, two physical endpoints, installed length, line ID, and variation reference. Add the actual drops to each device, including behind-ceiling detours and service tails that remain connected. An extra loop of cable in a cabinet counts toward installed length, even if its two endpoints look adjacent on the plan.
The electrical contractor can reconcile installed lengths from route measurements, reel markings where available, and documented installation records. Preserve the measurement basis. A measured run and a drawing estimate should have different entries so the next designer knows which figure still needs confirmation.
| Site change | Recalculate first | Also review |
|---|---|---|
| Cabinet moves farther down the corridor | Supply-to-device maximum | Space, supply and segregation at the new position |
| New room drops fan out from an existing junction | Total length and paths to opposite branches | Bus current, junction access and route identifiers |
| External run is added | All three lengths at the affected line | Entry boundary, cable environment and protection review |
| Two shown branches use a shared route | Actual topology and section lengths | Labels, maintenance isolation and as-built records |
Before handover, reconcile line memberships with the drawings, confirm where the very long branches terminate, and verify normal communication and bus voltage at representative remote points under the approved test plan. A successful telegram from the first device gives little evidence about the last one. A reachability issue on an existing installation can be worked through alongside the bus-voltage diagnostic guide.
Does a line coupler change the distance calculation?
Calculate the TP side of each electrical section according to its supported topology and product documentation. Track the coupler’s role and bus load on each relevant side. Adding a coupler in ETS alone leaves the physical cable unchanged. The coupler and IP router comparison explains the topology boundaries.
What should be reviewed before approving a cable substitution?
Ask for the exact cable reference, evidence that it meets the required TP characteristics, route and regulatory suitability, and confirmation that the intended terminals accept it. Recheck distances with the product-specific conditions. A route sketch and length schedule are useful inputs for a KNXmart design discussion.